GPU / Switch ASIC direct-to-chip cooling
TC-1500 GPU/Switch ASIC Liquid Cold Plate
1500 W Direct-to-Chip Copper Cold Plate
Copper liquid cold plate rated for 1500 W GPU and switch ASIC direct-to-chip cooling — the highest-TDP plate in the current TC series, built for the most demanding GPU and switch ASIC modules on direct-to-chip liquid cooling. TLP diffusion bonded, tested with pure water coolant, and 100% leak tested in production.
Request a quote
Download datasheet (PDF)

Key specifications
| Model | T-HS202316 — ToneCooling TC-1500 liquid cold plate |
|---|---|
| Application | GPU / Switch ASIC direct-to-chip cooling |
| Heat dissipation | 1500 W |
| Material | Copper, CNC machined |
| Joining method | Transient liquid-phase (TLP) diffusion bonding |
| Test conditions | Pure water coolant, 30°C inlet temperature |
| Flow rate / pressure drop | 2 LPM at 8 kPa |
| Cold plate surface temperature | ≤45°C |
| Working pressure | 1 MPa |
| Dimensions | 83 × 70 × 16.3 mm |
| Thermal resistance (plate, rated point) | ≤0.01 °C/W — calculated as (surface-temperature limit − coolant inlet) / heat load: (45 − 30)°C / 1500 W |
| Wetted materials | Copper (C1100 / T2) channel and port surfaces; fittings, tubing and quick disconnects per customer specification — confirmed against your coolant during DFM |
| CAD / drawings | STEP model and 2D drawing available under NDA — request with your RFQ |
| Validation | CFD flow and thermal simulation; helium leak and proof-pressure testing |
ToneCooling manufactures the TC-1500 GPU/Switch ASIC Liquid Cold Plate — 1500 W rated, CFD-validated before tooling and 100% leak tested under ISO 9001 at our Guangdong technical center, with North American customers supported by ToneCooling Texas LLC.
Why ToneCooling
Design, engineering, and manufacturing run in-house at the ToneCooling technical center in Guangdong — one accountable partner from CFD model to leak-tested hardware. Transient liquid-phase bonding gives the TC-1500 durable joints under repeated thermal cycling, and every part ships with the test documentation your qualification process needs. Prototype orders start from 1 piece with a 4–6 week prototype lead time, so an evaluation unit reaches your lab fast.
Applications
The TC-1500 targets the highest-TDP GPU and switch ASIC modules in AI server and data center racks, where a 1000-1200 W-class plate no longer covers the thermal design power.
TC-1500 GPU/Switch ASIC Liquid Cold Plate FAQ
What does the 1500 W rating mean?
It is the plate’s rated heat-dissipation capacity at the tested condition: pure water coolant, 30°C inlet, 2 LPM flow, surface temperature held at or below 45°C.
What if 1500 W is not the right heat load for my module?
ToneCooling also manufactures the TC-1200 on the same 83 × 70 × 16.3 mm envelope. Send your die/module heat load and the engineering team confirms which TC variant — or a fully custom plate — matches your project. See the TC-1000/1200/1500 comparison for all three side by side.
What coolant should be used?
Rated performance is tested with pure water at 30°C inlet. Data-center loops following ASHRAE W55 water quality are supported; alternative coolants are reviewed during DFM.
What flow rate does it need?
2 LPM at 8 kPa plate-level pressure drop under rated load. Your pump budget and manifold layout are checked against this during engineering review.
Can the design be customized?
Yes. Port locations, hose routing, mounting pattern, and surface finish are customized from your drawings. CFD simulation validates the change before tooling.
What is the Quantity and lead time?
Prototype orders start from 1 piece with a 4–6 weeks lead time from approved drawing and PO; production runs 6–8 weeks.
How is quality verified before shipment?
Helium leak testing and proof-pressure testing on the production line, plus flatness and dimensional checks to the acceptance criteria agreed in writing before quotation.
Request a quote
Send your drawing, heat map, coolant, and flow budget to info@tonecooling.com or use the quote form — the engineering team returns a manufacturable concept with the quotation. prototypes from 1 piece, prototype in 4–6 weeks.
Send drawings for engineering review or download the datasheet (PDF)


