A server CPU cold plate RFQ should include the official platform drawing, heat load per processor or module, coolant, flow-rate target, pressure-drop limit, port layout, chassis envelope, quantity and validation scope. If a drawing is not ready, send the closest mechanical reference and thermal requirement so the project can be screened before quotation.

Upload Drawing for Server CPU Cold Plate ReviewView Server CPU Cold Plate Hub
Server CPU Cold Plate RFQ Checklist for Drawing-Based Review

Engineering Inputs to Confirm

Drawing packageSocket or module drawing, mounting holes, keep-out zones, stack height and port direction.
Thermal inputsHeat load, inlet temperature, coolant type and expected temperature rise.
Hydraulic inputsFlow rate, pressure-drop target or limit, hose/fitting type and manifold constraints.
Validation inputsLeak test, pressure test, flatness, cleanliness, documentation and sample/batch quantity.

Related Product Paths

AMD EPYC SP5 liquid cold plate for server CPU cooling

AMD EPYC SP5 Dual CPU Liquid Cold Plate

Current listing data for engineering confirmation: 550 W x2 -25% EGW -purple copper T2

View product page
ToneCooling OP-4677 server CPU direct-to-chip liquid cooling

Intel LGA4677 CPU Liquid Cold Plate

Current listing data for engineering confirmation: [CONFIRM: up to] 700 W -Intel LGA4677

View product page
ToneCooling TC-1200 server CPU direct-to-chip liquid cooling

TC-1200

Current listing data for engineering confirmation: 1200 W -Pure Water -Copper

View product page

RFQ Checklist

Upload a drawing, CAD file or thermal specification if available. If drawings are not ready, send the closest platform reference and the following inputs:

  • Drawing or CAD file
  • CPU/platform or module footprint
  • Heat load and inlet temperature
  • Coolant type and concentration
  • Flow rate and pressure-drop target
  • Port direction and hose routing
  • Prototype quantity and annual demand
  • Leak / pressure / cleanliness requirement

Common Review Risk

Missing pressure-drop or envelope data usually causes the first quotation to be delayed because the channel path and port layout cannot be reviewed.

Related Engineering Resources

External Engineering References

FAQ

What should be sent before quotation?

Send the drawing or closest mechanical reference, heat load, coolant, flow rate, pressure-drop target, port layout, quantity and validation requirement.

Can ToneCooling confirm compatibility from the socket name alone?

No. Socket or platform names are useful references, but final layout and performance review require the customer drawing, server envelope and validation plan.

Where are these server CPU cold plates manufactured?

Manufacturing is based in Huizhou, Guangdong, China. Public copy should not state local manufacturing for regional markets unless separately verified.

Is a complete simulation required before RFQ?

A simulation is helpful but not mandatory for first review. If simulation data is not ready, share heat load, coolant, flow rate, pressure-drop target and available envelope information.

Scroll to Top

Get A Free Quote Now !

If you have any questions, please do not hesitate to contact us.

Quote Request
ToneCooling 19 thermal management