AIO liquid cooling module | OEM thermal projects
AIO Liquid Cooling Module Review for Compact Thermal Management Projects
ToneCooling reviews AIO liquid cooling module projects where heat load, radiator envelope, pump noise, tube routing, mounting space and service access must be checked before quotation.
Send a drawing, CAD file or thermal specification with target heat load, coolant loop requirement, radiator size, pump voltage, tube length, mounting pattern, quantity and annual demand.

Thermal Load Review
Review heat source power, target surface temperature, radiator capacity and airflow condition before selecting an AIO route.
Loop and Tube Routing
Check tube length, bend radius, port direction, pump position and service clearance against the device envelope.
Noise and Pump Inputs
Share pump voltage, noise target, working temperature and coolant requirement so the module can be screened properly.
Prototype and Batch RFQ
Provide prototype quantity, validation scope and annual demand to support quotation and manufacturing route review.
AIO Cooling Module RFQ Checklist

Heat Load
Processor, GPU or module power target.

Radiator Envelope
Available size, fan airflow path and clearance.

Pump Requirement
Voltage, noise target and control method.

Tube Routing
Tube length, bend radius and port direction.

Mounting Envelope
Footprint, screw pattern and service access.

Coolant Condition
Coolant, inlet temperature and environment.

Prototype Demand
Prototype quantity and annual demand range.

Validation Scope
Leak, pressure and reliability test needs.

Drawing Reference
CAD file, drawing or closest mechanical sample.
Manufacturing is based in Huizhou, Guangdong, China. Final module selection depends on the drawing, heat load, radiator envelope, pump requirement and validation scope.
Need a Custom Cold Plate for Your Project?
Send us your STEP/PDF file with TDP, coolant type, and flow requirements. Our engineers will deliver a thermal design proposal within 24 hours.
✓ ISO 9001 Certified | ✓ MOQ 5 pcs | ✓ Prototype in 4–6 weeks | ✓ NDA Available












